Waste Water

Longshaw St Warrington Combines Sewer Overflow Chamber
The works at Longshaw street included the construction of a new CSO chamber adjacent to the existing CSO. This was fitted with a powered screen.
Cleator Moor Overflow Chamber
Construction of a new on-line Combined Sewer Overflow chamber within a field and associated overflow sewer and manhole. The chamber received a Longwood
Weeton Waste Water
This waste water project in Blackpool meant a complete construction of a new screen chamber and the installation of a Huber Rotamat Microstrainer complete with a screenings
Pilling Waste Water
This 52 week project involved the full construction of a new waste water treatment work on a greenfield site.
Barton Waste Water
The extension to an existing waste water treatment works involving the construction of 2 primary tanks, 1 humus tank, nitrifying filter, pumping station and associated works.